Search results

Explore only content tagged with
3 Results
Sorted by relevance

Global Re-introduction Perspectives: 2011 - More case studies from around the globe

… Post-release monitoring: During the enclosure period one observer conducted standardized surveys to monitor the new … Once all A. polops were translocated, every other day the observer walked slowly around every enclosure for 10 minutes, … were made on the alternating days, in which the observer walked around an enclosure for 10 minutes or until …
25 May 2026 Literature See it in ECOLEX · This content is provided by ECOLEX

Guidelines for Reintroductions and other Conservation Translocations (Version 1.0)

25 May 2026 Literature

Best practice guidelines for the re-introduction of great apes

25 May 2026 Literature See it in ECOLEX · This content is provided by ECOLEX